Projects

exterior of the Meritus School of Osteopathic Medicine's Academic Building

Meritus School of Osteopathic Medicine’s Academic Building

Set to transform medical education in Hagerstown, MD, the Meritus School of Osteopathic Medicine’s Academic Building is a testament to progress and dedication. With construction commencing in fall 2023, this 5-story, 200,815 square feet structure, led by Davis Construction, represents an investment of 85 to 90 million dollars.

Hagerstown Multi-Use Sports stadium rendering

Hagerstown Multi-Use Sports Event Center

In October of 2021, the Maryland Stadium Authority authorized and issued $59.5 million to construct a new Multi-Use Sports Event Center in downtown Hagerstown. Construction started in the Fall of 2023 with an estimated competition date of Spring of 2024. Kaempf and Harris received the award from “Harlee Mechanical Contracting Inc.” in partnership with “Denver-Elek Inc.” to provide the ductwork and associated air devices on the project. Production had to begin immediately to meet the demanding schedule required for this project to finish in time.

Interior of Ellume building HVAC

Ellume Building A

In May 2021, Australia-based digital diagnostics company Ellume, announced it had established its first U.S. manufacturing facility in Frederick, Maryland.

Ellume was awarded 231.8 million in an agreement with the U.S. Department of Defense and the department of Health and Human Services, to accelerate the production of Ellume’s COVID-19 Home Test Kits.

Library of Congress Collection Storage Module

Collection Storage Module 6 – Library of Congress

In 1994, a 100-acre site located in the US Army base at Fort Meade, Maryland, was assigned to the US Congress to provide additional storage capacity for the Library of Congress.

State-of-the-art storage modules are being built to house, preserve, and protect the library’s various collections that include books, bound periodicals, maps, manuscripts, prints, photographs, sheet music and microfilm.

mercersburg aquatic center pool

Mercersburg Aquatic Center

Kaempf & Harris provided the ductwork and installation at the Mercersburg aquatic center. Our team worked diligently to install the ductwork track that would provide exceptional airflow while also fitting in the space.

frederick's rose hill cancer center waiting room

Frederick’s Rose Hill Cancer Center

Kaempf & Harris facilitated the construction of this 3-story medical facility that required more than 75,000 lbs of sheet metal. This facility will bring state of the art cancer treatment to the residents of Frederick, Maryland.

exterior of frederick memorial hospital

Frederick Memorial Hospital

Kaempf & Harris remodeled the Frederick Memorial Hospital while maintaining spaces critical to operation. The remodel resulted in a new MRI room, endoscopy wing, and updated patient rooms. This project also included new construction, involving a new emergency entrance, and ambulatory entrance.

cole field house football field

Cole Field House

Kaempf & Harris began renovating and converting the existing Cole Field House, originally completed in 1955, into an indoor football practice facility. This is the first phase of three that will transform the original building into a 356,000-square foot facility. This will make Cole Field House one of the largest NCAA indoor facilities in the country.

interior MTA bus maintenance facility

MTA Bus Maintenance Facility

Kaempf & Harris constructed a 100,000 square foot maintenance facility with sustainability and energy efficiency in mind. This project included 15 service bays and a fully exposed ductwork system in order to maximize efficiency. This design also incorporated additional parking, reducing congestion in this residential neighborhood.

frederick high school gymnasium

Frederick High School

Kaempf & Harris installed more than 600,000 pounds of galvanized ductwork and 16,000 pounds of solid welded stainless steel that served 25 air handler units, 67 fans, 5 make-up air units, and 113 heat pumps. Additionally, the team installed six mechanical rooms, 1,500 registers, grilles, and diffusers; and 305 fire and fire/smoke dampers.

exterior of mercersburg academy student union building

Mercersburg Academy Student Union Building

Kaempf & Harris successfully navigated tight ceiling space and an even tighter project timeline to deliver modern HVAC systems.

exterior of carroll hospital cancer center

Carroll Hospital Cancer Center

Kaempf and Harris embarked on a two-phase construction project to deliver a custom HVAC system for the Carroll Hospital Cancer Center.

exterior of gaithersburg public library

Gaithersburg Public Library

Kaempf and Harris helped expand and modernize the Gaithersburg Public Library and help it achieve LEED Certification.

exterior of NOVA higher education center

NOVA Higher Education Center

Kaempf and Harris assisted with building a new higher education center on the campus of Northern Virginia Community College in Sterling, VA.

Contact Us for Your Metal Fabrication Needs

Have questions about metal fabrication or installation? We’re happy to start a conversation!

Recent Blog Posts

local metal fabrication

6 Reasons to Choose A Local Metal Fabricator

Read More

welder with OSHA training welding metal with blue flame

Kaempf & Harris Team Completes OSHA Training

Read More

ribbon cutting for new frederick health thurmont immediate care building

Frederick Health Thurmont Immediate Care Ribbon Cutting

Read More