exterior of mercersburg academy student union building

Mercersburg Academy Student Union Building

Historic School Building Gets a New Look

Kaempf & Harris performed well under challenging circumstances, successfully navigating tight ceiling space and an even tighter project timeline to deliver modern HVAC systems to the campus kitchen and the existing dining hall.

In addition, the team added HVAC ductwork to historic Ford Hall, helping to successfully convert its basement into a brand new, vibrant student center that included two new private dining halls and a student lounge.

The team adjusted to design and engineering challenges, coordinated with the wider team to avoid impacting campus life and successfully completed their portion of the project within the compressed timeframe and within budget.

Project Stats

Project Type

Renovation, Historic and Modern Structures

Project Specs

46,400 Square Feet

General Contracting Partner

Mowery Construction

Mechanical Contracting Partner

Musser Mechanical

Location

Mercersburg PA

Project Photos

interior of mercersburg academy student union building
interior ceiling of mercersburg academy student union building

Contact Us for Your Metal Fabrication Needs

Have questions about metal fabrication or installation? We’re happy to start a conversation!

Recent Blog Posts

local metal fabrication

6 Reasons to Choose A Local Metal Fabricator

Read More

welder with OSHA training welding metal with blue flame

Kaempf & Harris Team Completes OSHA Training

Read More

ribbon cutting for new frederick health thurmont immediate care building

Frederick Health Thurmont Immediate Care Ribbon Cutting

Read More